WorkLink Create: Replacing Project Asset
If you have revised an asset in your project, follow the steps in this video to replace the asset (i.e. put the new revision into your project):
Note: "Keep Old Materials" in the Replace Project Asset window has been renamed to "Overwrite Existing Step Materials with New Asset Material"(Same functionality).
Learn more: Revision Editor: Improve performance of heavy models with the CAD Pipeline.